READ Free Dumps For EMC- E20-011
Question ID 19749 | Which post-fix task associated with Problem Management is performed by the storage |
Option A | Review alert thresholds to determine if adjustments are required |
Option B | Review SLA and adjust agreements to reflect lower service expectations |
Option C | Update CMDB with an accurate mix of hardware, software, and process to ensure storage is always available |
Option D | Update Storage Availability Plan and Storage Capacity Plan with accurate information on storage availability trends |
Correct Answer | A |
Question ID 19750 | Which topology offers maximum bandwidth scalability? |
Option A | Fibre Channel Arbitrated Loop |
Option B | 17 switches (16 ports each) in a full mesh switch fabric |
Option C | Point-to-point connectivity |
Option D | Switched fabric with maximum ports per backplane |
Correct Answer | D |