AllExam Dumps

DUMPS, FREE DUMPS, VCP5 DUMPS| VMWARE DUMPS, VCP DUMPS, VCP4 DUMPS, VCAP DUMPS, VCDX DUMPS, CISCO DUMPS, CCNA, CCNA DUMPS, CCNP DUMPS, CCIE DUMPS, ITIL, EXIN DUMPS,


READ Free Dumps For IBM- C2090-423





Question ID 12813

Which of the following represents the minimum post-installation configuration steps to verify
Information Analyzer is ready for analysis work?

Option A

 Information Analyzer is automatically configured during installation and no post- installation configuration is required.

Option B

Create a user and assign Information Server Suite Access, Configure server DSN to Analysis database, validate Analysis Engine, verify connectivity to the Analysis database.

Option C

Create a user and assign the role of Information Analyzer Project Administrator, configure server DSN to Analysis database, validate Analysis Engine, verify connectivity to the Analysis database.

Option D

Create a user and assign the role of Information Analyzer Data Administrator with DataStage credentials, configure server DSN to Analysis database, validate Analysis Engine, verify connectivity to the Analysis database.

Correct Answer D
Explanation


Question ID 12814

Which of the following are therequired options to schedule an Information Analyzer process
to run on every Friday?

Option A

Enter a Start Date; Set a Custom Frequency

Option B

Set a Custom Frequency; Enter an End Date

Option C

Enter a Start Date; Set a Task Status of Weekly

Option D

Enter a Schedule Description; Set a Custom Frequency

Correct Answer A
Explanation

Send email to admin@getfreedumps for new dumps request!!!