READ Free Dumps For Cisco- 642-732
Question ID 19219 | Refer to the exhibit. In testing the post-deployment WLAN network you have discovered an AP that has been |
Option A | Add additional APs. |
Option B | Replace the AP with an AP and external antenna. |
Option C | Increase the AP power level to maximum. |
Option D | Change the AP location to one that is less RF hostile. |
Option E | Rotate the AP 90 degrees to change antenna polarity. |
Correct Answer | A,B |
Question ID 19220 | When planning to perform a customer WLAN site survey, which three components and |
Option A | Schedule a meeting with the customer to discuss the Statement of Work |
Option B | Complete the Pre-Survey Customer Questionnaire |
Option C | Schedule customer end user interviews |
Option D | Consider travel, access, and equipment requirements necessary to perform the site survey |
Option E | Schedule initial customer meeting and pre-survey walkthrough events |
Option F | Determine radio spectrum and channel allocation |
Correct Answer | B,D,E |