Question ID 19657

An administrator has multiple vCenter Server 6.5 systems but cannot enable Storage I/O Control (SIOC) on a datastore shared by ESXi hosts managed by the
vCenter Server systems.
Which action should the administrator take to resolve the issue?

Option A

Unmount the datastore and then enable SIOC on the vCenter Server system.

Option B

Configure the datastore to be managed by a single vCenter Server system.

Option C

Configure Storage DRS and then enable SIOC on the vCenter Server system.

Option D

Enable Raw Device Mapping (RDM) on the ESXi hosts.

Correct Answer B
Explanation


Question ID 19658

In a vSphere 6.5 cluster, the administrator notices that it is possible to set a percentage in the DRS option, “Control CPU over-commitment in the cluster.”
Which is the purpose of this setting?

Option A

It sets and enforces a maximum percentage of virtual machine CPU usage in GHz in comparison to physical CPU availability in GHz.

Option B

It sets and enforces a maximum ratio in percentage between powered on virtual machine CPUs and available physical CPUs on hosts.

Option C

It prevents the creation of any additional virtual machines in the cluster.

Option D

It calculates the total shares assigned to all virtual machines in comparison to GHz of available physical CPU.

Correct Answer A