READ Free Dumps For Oracle- 1z0-238
Question ID 3023 | Identify five required post-installation tasks for Oracle Applications R12 E-Business Suite. (Choose four.) |
Option A | A. Set up a stage directory. |
Option B | B. Configure the client software. |
Option C | C. Review security practices. |
Option D |
|
Option E |
|
Option F | F. Configure database initialization parameters. |
Correct Answer | B,C,E,F |
Question ID 3024 | The patch 384610 was applied to the test environment successfully. To schedule the patch to be applied to the production environment, the Applications DBA should inform the users of the unavailability of the production environment. Which report can the Applications DBA look at to determine the estimated duration of the task, assuming that the hardware, server load, and applications running on the servers are unchanged? |
Option A | A. Timing report |
Option B | B. Bug Fixes report |
Option C | C. Files Copied report |
Option D | D. Action Details report |
Option E | E. Patch Details report |
Option F | F. Action Summary report |
Correct Answer | A |