READ Free Dumps For Oracle- 1z0-238
Question ID 2916 | In AD Controller, when a job fails the first and second time, the manager automatically defers it to the end of the phase and assigns a new job to the worker. If the deferred job fails the third time, the job stays at the failed status and the worker waits. At this point, you must address the cause of the failure, and then restart the job using AD Controller. Choose two correct steps that would help you to troubleshoot the failure of the job and enable you to run the job to completion. (Choose two.) |
Option A | A. Verify whether the process is consuming CPU time. |
Option B | B. Review the adworkXXX.log worker log file in $APPL_TOP/admin/<SID>/log to find the error. |
Option C | C. Review the file name and worker columns of the failed worker to find the name of the failed file and the worker number. |
Option D | D. Check for an entry for this process in the V$SESSION table to gather clues about what the process is doing in the database. |
Correct Answer | B,C |
Question ID 2917 | Which can be patched using the AutoPatch utility? (Choose all that apply.) |
Option A | A. Oracle Database |
Option B | B. Oracle Applications |
Option C | C. Oracle Application Server |
Option D | D. Oracle Development Tools |
Correct Answer | B |