READ Free Dumps For Oracle- 1z0-050
Question ID 1881 | |
Option A | A. The COMMIT order in the captured workload is preserved during replay. |
Option B | B. The value 100 in the THINK_TIME_SCALE parameter attempts to make the replay client shorten the think time between calls. |
Option C | C. The value 100 in the CONNECT_TIME_SCALE parameter attempts to connect all sessions as captured. |
Option D | D. The value 100 in the THINK_TIME_SCALE parameter attempts to match the captured user think time while |
Option E | E. The value 100 in the CONNECT TIME_SCALE parameter attempts to connect all sessions immediately as soon as the replay begins. |
Correct Answer | A,C,D |
Question ID 1882 | Which two prerequisites are needed for performing workload capture and replay? (Choose two.) |
Option A | A. setting up the directory to capture the workload |
Option B | B. running the database in shared server mode |
Option C | C. Close all sessions performing queries using database links. |
Option D | D. The database on which the workload is replayed has to be a restore of the original database to a specific SCN. |
Correct Answer | A,D |